-Minneapolis, MN- The site was occupied by a one-story below grade parking structure (street level and basement parking) with a foot print of 100’ (East-West) x 157.24’ (North-South). The South and West sides are alleys and the North and East sides are city streets. The parking garage was constructed in 1992 and prior to the […]
You are browsing archives for
Category: Highlighted Project
Target Field Station
-Minneapolis, MN- (Formally known as “The Interchange”) This iconic project, Target Field Station, is located at the West edge of downtown Minneapolis adjacent to the Target Field and provides a convenient access to transit riders. The Target Field Station includes a two-level parking structure with 291-public parking stalls and a new two-level Hennepin Energy Recovery […]
Treasure Island Resort & Casino Expansio
– Welch, MN- The Treasure Island Resort & Casino Expansion project was a design-build fast track project completed with Knutson Construction as the General Contractor. Construction drawings were prepared as building materials were ordered. The casino and hotel expansion project includes a new six story hotel with 230 additional hotel rooms in two wings, a […]
Mother-Baby Program, Allina Children’s H
– Minneapolis, MN – Mother-Baby Program is a 96,000 sq. ft., four-story, new building to be constructed in the tight space between the existing Children’s Hospital on the North and West side and Parking ramp #2 on the east side. Southerly portion of the proposed building will be partially over the existing one story below grade […]
United / Children’s Hospital Expansion
– St. Paul, MN – This new 6-story tower with a floor area of roughly 192,000 sq. ft., was built in a portion of the site that was originally occupied by the ambulance garage, United Hospital’s emergency department, access roadway to the existing parking ramp, access road to the children’s main entrance and landscaped grounds. […]
US Bank Stadium
– Minneapolis, MN – Palanisami & Associates is one of the structural engineers on the team designing the US Bank Stadium (formally known as Minnesota Multi-Purpose Stadium). PAI was responsible for the foundation of the new structure. This project will seek LEED certification once construction is complete in 2016. A total of 65,000 people can be seated at […]
The Shops at West End
– St. Louis Park, MN – The Shops at West End is a mixed-use development. PAI designed four buildings for the development. Building 21, 212,700 sq ft, has a one level below grade parking with three buildings above. The below grade parking is a precast system to support the one story and 2 story buildings […]
Minneapolis/St. Paul International Airpo...
– Minneapolis, MN – This nine-story ramp expansion project at the Minneapolis-St. Paul International Airport consists of 8,500 stalls, occupies three million square feet, and has four new 100 ft. diameter helices. The lower three levels provide service for rental cars including quick turnaround facilities. Under Spline Road there is a 1,200 foot tunnel for […]