Posts in category Completed Projects

Treasure Island Resort & Casino ...

Treasure Island Resort & Casino – The Lagoon and Wave Spa

– Welch, MN – New 30,000 sf one-story pool and spa addition adjacent to the hotel that was built in 2007. The addition includes a large indoor family pool with two slides, smaller indoor adult pool with a swim-up barefoot bar, 320 ft. lazy river, zero depth family pool with water features and Toucan slide, […]

MN Army National Guard Readiness Cent...

MN Army National Guard Readiness Center

–Stillwater, Minnesota– The Readiness Center will be the home base and primary training center for two Minnesota National Guard units, the Headquarters Company of the 34th Support Training Battalion and the 34th Military Police Company. The Readiness Center is a 93,000 sf, two-story building that includes arms vault, gear storage areas, administrative offices, classrooms, assembly […]

Luther Midelfort Hospital Parking Ram...

Luther Midelfort Hospital Parking Ramp

   -Eau Claire, WI- Palanisami & Associates were selected following a competitive evaluation process by the Mayo Clinic as the prime consultant for this new 779 stall, four level parking ramp located adjacent to the Luther Midelfort Hospital in Eau Claire, Wisconsin.   As prime consultant, PAI led the design team of architects and engineers to […]

Spectrum Commerce Center

Spectrum Commerce Center

-Eagan, MN-   This is a unique project in design and construction.  The project covers 20 acres of land right along the Highway 55 frontage.  The footprint of the building covers 300,000 sq. ft. of office space at  the first floor.  The second floor is enclosed parking for 990 stalls.  The columns, beams and precast […]

Treasure Island Resort & Casino

Treasure Island Resort & Casino

-Welch, MN-   This project involved the design and construction of an expansion for the growing Treasure Island Casino. A new two story office and warehouse addition of 203,333 square feet was built during casino operations. The addition expanded the casino gaming area, added a two story office building and a two story warehouse for […]

MnDOT Rochester Maintenance Facility

MnDOT Rochester Maintenance Facility

-Rochester, MN- The new 122,000-square-foot facility will house all maintenance operations for the Rochester area, including the Rochester Truck Station, and become the maintenance support headquarters for Dodge, Fillmore, Houston, Mower, Olmsted, Wabasha and Winona counties. The additional space will provide a safer, more cost-effective work environment with larger maintenance bays for larger snowplows, increased […]

UNIVERSITY OF MINNESOTA – 4TH S...

UNIVERSITY OF MINNESOTA – 4TH STREET RAMP

 – Minneapolis, MN – The University of Minnesota Fourth Street Parking Ramp project consists of a new five-level parking structure with two glass-backed elevators and two enclosed stair towers. The structural system is constructed with post-tensioned slab and beam construction with micro-silica concrete. The parking structure has three entrance lanes and three exit lanes. A […]

United Hospital Parking Ramp

United Hospital Parking Ramp

-St. Paul, MN-   The United Hospital in St. Paul provides parking for employees and visitors in campus parking ramps, campus surface lots and in remote surface lots. In 1986, Palanisami & Associates, Inc. designed a 430 stall 3-tier parking ramp. The ramp is composed of 3-bays with traffic circulating in one direction. The structure, […]

RAND TOWER PARKING GARAGE

RAND TOWER PARKING GARAGE

Minneapolis, MN     589 stalls 11 levels (3 below grade, 8 above grade) Completely enclosed with ventilation and sprinklers systems Two glass backed elevators Two enclosed stair towers Skyway connection through the garage Display windows along the street Rental storage space Automatic vehicle identification One entrance lane and two exit lanes Closed circuit TV […]

9TH & MARQUETTE METRO RAMP

9TH & MARQUETTE METRO RAMP

-Minneapolis, MN-   9th and Marquette is a 329,000 square foot mixed-use facility consisting of parking, retail, and apartments. The building has a storage/conference area in the basement and a street level lobby/retail space. Above, there is 9-tiers of public parking followed by 7-levels of apartments. The apartment and parking areas are accessed using different […]

Mission Statement


Effective control of a project's scope, budget and schedule and understanding the inter-relationship of these three elements largely determine the project's success and overall quality.

Highlighted Projects

Copyright © 2017 | Palanisami & Associates, Inc.