– Ortonville, MN –

 

63,000 ft², new replacement hospital, one-story with partial basement adjacent to the existing hospital building. Demolition and construction was done in three phases.

 

The construction type consists of steel columns and beams, composite concrete slab-on-metal deck at first floor above basement, slab-on-grade elsewhere and steel joists and metal deck on steel beams and columns at roof.

 

PAI prepared structural calculations, drawings, and specifications. PAI reviewed the soils report, reviewed quality control tests and structural shop drawings, and preformed on-site inspections.

 

Construction Cost:    $20  million

Construction Period:   2008 –2009