-St. Cloud, MN-

 

stcloud2Palanisami & Associates were selected following a State Architects Office, State Designer Selection Board proposal and interview process as the prime consultant for this new 500 stall, three level, 159,000 sf, post-tensioned concrete parking ramp located in the center of the St. Cloud State University campus.

As prime consultant, PAI led the design team of architects and engineers to design and construct the parking ramp which also included a 5000 sq. ft. area public safety building.

PAI performed engineering calculations and developed certified construction drawings for bidding. PAI assisted during bidding and provided inspections during construction.

 

Construction Cost: $7.8 million
Construction Period: July 2007 – July 2008