{"id":137,"date":"2014-03-29T06:44:05","date_gmt":"2014-03-29T06:44:05","guid":{"rendered":"https:\/\/www.palanisami.com\/?p=137"},"modified":"2015-02-04T19:01:19","modified_gmt":"2015-02-04T19:01:19","slug":"midtown-medical-office-building","status":"publish","type":"post","link":"https:\/\/www.palanisami.com\/?p=137","title":{"rendered":"Midtown Medical Office Building"},"content":{"rendered":"\n<!-- FB Like Button Starbit IT Solutions BEGIN -->\n<div class=\"fb-like\" data-href=\"https:\/\/www.palanisami.com\/?p=137\" data-layout=\"standard\" data-action=\"like\" data-show-faces=\"false\" data-size=\"small\" data-width=\"450\" data-share=\"\" ><\/div>\n<!-- FB Like Button Starbit IT Solutions END -->\n<h3 align=\"center\">-Minneapolis, MN-<b><\/b><\/h3>\n<p>This project consists of a four story, 57,000 ft\u00b2, 90\u2019 by\u00a0160\u2019, Medical Office Building featuring steel beam\u00a0framing and composite deck floors.\u00a0 The project used\u00a0a design-build project delivery approach.<\/p>\n<p><a href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-136\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical1-300x197.jpg\" alt=\"medical1\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical1-300x197.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical1.jpg 510w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Design work included a metal roof deck and steel bar\u00a0joist roof with roof top equipment to rest on extended\u00a0columns or beams or on concrete slabs to minimize\u00a0vibration.<\/p>\n<p>&nbsp;<\/p>\n<p>MRI equipment is located on the first level with high\u00a0density storage at the upper floors. There is a second\u00a0level skyway connecting the MedicalOfficeBuilding\u00a0and a new parking ramp.<\/p>\n<p><a href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-135 alignright\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical2-300x225.jpg\" alt=\"medical2\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical2-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical2-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/medical2.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>\u00a0PAI engineers contributed during the design phase,\u00a0reviewed the geotechnical report and recommended\u00a0soil boring locations along with preparing all building\u00a0shell framing plans.\u00a0 PAI, during design development,\u00a0assisted the architect in structural system selection,\u00a0column layout, structural calculations and plans for\u00a0construction.<\/p>\n<p>&nbsp;<\/p>\n<p>PAI staff reviewed and edited the structural\u00a0specifications and prepared documents and plan sets\u00a0for construction bidding.\u00a0 Additional services included;\u00a0structural inspections during construction and field\u00a0quality control services.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Construction Cost:<\/strong> \u00a0\u00a0\u00a0\u00a0\u00a0$3 million<\/p>\n<p style=\"text-align: left;\" align=\"center\"><strong>Construction Period:<\/strong>\u00a0 \u00a0Spring- Fall 2007<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>-Minneapolis, MN- This project consists of a four story, 57,000 ft\u00b2, 90\u2019 by\u00a0160\u2019, Medical Office Building featuring steel beam\u00a0framing and composite deck floors.\u00a0 The project used\u00a0a design-build project delivery approach. Design work included a metal roof deck and steel bar\u00a0joist roof with roof top equipment to rest on extended\u00a0columns or beams or on concrete slabs [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,13,21],"tags":[],"class_list":["post-137","post","type-post","status-publish","format-standard","hentry","category-completed-projects","category-hospitals","category-office"],"_links":{"self":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=137"}],"version-history":[{"count":4,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/137\/revisions"}],"predecessor-version":[{"id":851,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/137\/revisions\/851"}],"wp:attachment":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}