{"id":139,"date":"2014-03-29T06:47:01","date_gmt":"2014-03-29T06:47:01","guid":{"rendered":"https:\/\/www.palanisami.com\/?p=139"},"modified":"2015-02-04T18:56:01","modified_gmt":"2015-02-04T18:56:01","slug":"ortonville-area-health-services-hospital","status":"publish","type":"post","link":"https:\/\/www.palanisami.com\/?p=139","title":{"rendered":"Ortonville Area Health Services Hospital"},"content":{"rendered":"\n<!-- FB Like Button Starbit IT Solutions BEGIN -->\n<div class=\"fb-like\" data-href=\"https:\/\/www.palanisami.com\/?p=139\" data-layout=\"standard\" data-action=\"like\" data-show-faces=\"false\" data-size=\"small\" data-width=\"450\" data-share=\"\" ><\/div>\n<!-- FB Like Button Starbit IT Solutions END -->\n<h3 align=\"center\">&#8211; Ortonville, MN &#8211;<\/h3>\n<p>&nbsp;<\/p>\n<p>63,000 ft\u00b2, new replacement hospital, one-story with partial basement adjacent to the existing hospital building. Demolition and construction was done in three phases.<\/p>\n<p>&nbsp;<\/p>\n<p>The construction type consists of steel columns and beams, composite concrete slab-on-metal deck at first floor above basement, slab-on-grade elsewhere and steel joists and metal deck on steel beams and columns at roof.<\/p>\n<p>&nbsp;<\/p>\n<p>PAI prepared structural calculations, drawings, and specifications. PAI reviewed the soils report, reviewed quality control tests and structural shop drawings, and preformed on-site inspections.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Construction Cost:<\/strong>\u00a0 \u00a0\u00a0$20 \u00a0million<\/p>\n<p><strong>Construction Period:<\/strong>\u00a0 \u00a02008 \u20132009<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>&#8211; Ortonville, MN &#8211; &nbsp; 63,000 ft\u00b2, new replacement hospital, one-story with partial basement adjacent to the existing hospital building. Demolition and construction was done in three phases. &nbsp; The construction type consists of steel columns and beams, composite concrete slab-on-metal deck at first floor above basement, slab-on-grade elsewhere and steel joists and metal deck [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-139","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/139","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=139"}],"version-history":[{"count":6,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/139\/revisions"}],"predecessor-version":[{"id":849,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/139\/revisions\/849"}],"wp:attachment":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=139"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=139"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=139"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}