{"id":237,"date":"2014-03-29T08:47:46","date_gmt":"2014-03-29T08:47:46","guid":{"rendered":"https:\/\/www.palanisami.com\/?p=237"},"modified":"2014-08-20T21:24:26","modified_gmt":"2014-08-20T21:24:26","slug":"joint-operations-center","status":"publish","type":"post","link":"https:\/\/www.palanisami.com\/?p=237","title":{"rendered":"Joint Operations Center &#8211; National Guard Armory"},"content":{"rendered":"\n<!-- FB Like Button Starbit IT Solutions BEGIN -->\n<div class=\"fb-like\" data-href=\"https:\/\/www.palanisami.com\/?p=237\" data-layout=\"standard\" data-action=\"like\" data-show-faces=\"false\" data-size=\"small\" data-width=\"450\" data-share=\"\" ><\/div>\n<!-- FB Like Button Starbit IT Solutions END -->\n<h3 align=\"center\"><b>&#8211; St. Paul, MN &#8211;<\/b><\/h3>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-236 alignright\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc1-300x225.jpg\" alt=\"joc1\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc1-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc1-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc1.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>\u00a0This project involved combining several law enforcement and military related information systems at one emergency operations center.<\/p>\n<p>The old National guard armory had an existing 60\u2019 by 40\u2019, 2,600 square foot classroom that PAI engineers helped remodel to contain communications monitoring systems, radios, large video screens, cameras and security systems with back-up generator power.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-234\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc2-300x225.jpg\" alt=\"joc2\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc2-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc2-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc2.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>PAI provided the electrical &amp; mechanical design services for construction that was staged because the work was done while the Joint Operations Center was active.<\/p>\n<p>PAI engineers prepared structural, mechanical &amp; electrical plans, calculations and specifications for the Joint Operations Center following meetings with the architect to determine the specific JOC facility design requirements. PAI engineers also reviewed shop drawings, performed inspections and construction administration &amp; management during construction.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-235 alignright\" style=\"line-height: 18px;\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc3-300x225.jpg\" alt=\"joc3\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc3-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc3-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/03\/joc3.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span style=\"font-size: 12px; line-height: 18px;\">\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Construction Period:<\/strong> June 2004 \u2013 Dec. 2004<\/p>\n<p><strong>Construction Cost:<\/strong> $500,000<\/p>\n<p>&nbsp;<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>&#8211; St. Paul, MN &#8211; &nbsp; \u00a0This project involved combining several law enforcement and military related information systems at one emergency operations center. The old National guard armory had an existing 60\u2019 by 40\u2019, 2,600 square foot classroom that PAI engineers helped remodel to contain communications monitoring systems, radios, large video screens, cameras and security [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,19],"tags":[],"class_list":["post-237","post","type-post","status-publish","format-standard","hentry","category-completed-projects","category-military"],"_links":{"self":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=237"}],"version-history":[{"count":4,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/237\/revisions"}],"predecessor-version":[{"id":727,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/237\/revisions\/727"}],"wp:attachment":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}