{"id":447,"date":"2014-04-04T20:37:56","date_gmt":"2014-04-04T20:37:56","guid":{"rendered":"https:\/\/www.palanisami.com\/?p=447"},"modified":"2015-02-04T17:50:39","modified_gmt":"2015-02-04T17:50:39","slug":"lake-street-police-station","status":"publish","type":"post","link":"https:\/\/www.palanisami.com\/?p=447","title":{"rendered":"Lake Street 3rd Precinct Police Station"},"content":{"rendered":"\n<!-- FB Like Button Starbit IT Solutions BEGIN -->\n<div class=\"fb-like\" data-href=\"https:\/\/www.palanisami.com\/?p=447\" data-layout=\"standard\" data-action=\"like\" data-show-faces=\"false\" data-size=\"small\" data-width=\"450\" data-share=\"\" ><\/div>\n<!-- FB Like Button Starbit IT Solutions END -->\n<p style=\"text-align: center;\"><a href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-820\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-1-1024x768.jpg\" alt=\"Exterior 1\" width=\"610\" height=\"457\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-1-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-1-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-1.jpg 1280w\" sizes=\"auto, (max-width: 610px) 100vw, 610px\" \/><\/a>-Minneapolis, MN-<\/p>\n<p style=\"text-align: left;\"><b><b><br \/>\n<\/b><\/b><\/p>\n<p>This 24,500 square foot project required structural design for a partial remodeling and a 3 story addition to more than double the size of the growing Police Precinct.<\/p>\n<p>&nbsp;<\/p>\n<p>PAI was selected as structural experts for the design team by Minneapolis Property Services to design the expansion.\u00a0 PAI conducted a comprehensive facility audit and reviewed existing plans and variations from the current plans that existed within the current facility.\u00a0 Code required special structural inspections were performed by PAI.<\/p>\n<p>&nbsp;<\/p>\n<p>The Police operated in and occupied the Precinct building during the entire construction process.\u00a0 PAI provided schematic design, design development, construction documents and construction administration.<\/p>\n<p>&nbsp;<\/p>\n<p>The existing building consisted of two stories plus a full basement and is supported by conventional spread footings. \u00a0\u00a0Partial foundation re-design was provided by PAI for the 3 story addition.<\/p>\n<p>&nbsp;<\/p>\n<p>The foundation walls consist of concrete block masonry.\u00a0 The basement floor is concrete slab-on-grade.\u00a0 Pre-cast slabs were used on floors.\u00a0 Matching exterior brick facing was used along with EIFS on the back side<\/p>\n<p>&nbsp;<\/p>\n<p>The structural frame consists of steel columns, both wide-flange and tube columns, and steel wide-flange beams.<\/p>\n<p>&nbsp;<\/p>\n<p>The project was done within budget and schedule.<\/p>\n<p style=\"text-align: left;\"><b><b>Construction Period\u00a0\u00a0\u00a0\u00a0<\/b>2004<br \/>\n<b>Construction Cost\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0<\/b>$4.63 million<\/b><\/p>\n<p style=\"text-align: left;\">\n<p style=\"text-align: left;\"><a href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-21.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-821\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-21-1024x768.jpg\" alt=\"Exterior 2\" width=\"610\" height=\"457\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-21-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-21-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/04\/Exterior-21.jpg 1280w\" sizes=\"auto, (max-width: 610px) 100vw, 610px\" \/><\/a><\/p>\n<div id=\"column2\"><b>\u00a0\u00a0\u00a0<\/b><\/div>\n ","protected":false},"excerpt":{"rendered":"<p>-Minneapolis, MN- This 24,500 square foot project required structural design for a partial remodeling and a 3 story addition to more than double the size of the growing Police Precinct. &nbsp; PAI was selected as structural experts for the design team by Minneapolis Property Services to design the expansion.\u00a0 PAI conducted a comprehensive facility audit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,21,17],"tags":[],"class_list":["post-447","post","type-post","status-publish","format-standard","hentry","category-completed-projects","category-office","category-prison-correctional"],"_links":{"self":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=447"}],"version-history":[{"count":5,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/447\/revisions"}],"predecessor-version":[{"id":822,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/447\/revisions\/822"}],"wp:attachment":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}