{"id":592,"date":"2014-05-05T18:41:26","date_gmt":"2014-05-05T18:41:26","guid":{"rendered":"https:\/\/www.palanisami.com\/?p=592"},"modified":"2015-02-04T21:33:15","modified_gmt":"2015-02-04T21:33:15","slug":"ramsey-county-public-works-facility","status":"publish","type":"post","link":"https:\/\/www.palanisami.com\/?p=592","title":{"rendered":"Ramsey County Public Works Facility"},"content":{"rendered":"\n<!-- FB Like Button Starbit IT Solutions BEGIN -->\n<div class=\"fb-like\" data-href=\"https:\/\/www.palanisami.com\/?p=592\" data-layout=\"standard\" data-action=\"like\" data-show-faces=\"false\" data-size=\"small\" data-width=\"450\" data-share=\"\" ><\/div>\n<!-- FB Like Button Starbit IT Solutions END -->\n<p style=\"text-align: center;\"><b>&#8211; Arden Hills<\/b><b>, Minnesota &#8211;<\/b><\/p>\n<p><a href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-593 alignright\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey3-300x225.jpg\" alt=\"ramsey3\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey3-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey3-1024x768.jpg 1024w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey3.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a> The new 190,000 square foot Ramsey County\/Partners facility built on the former TCAAP property was designed as a shared resource center with office space, high ceilings for front end loaders, heavy cranes and snow plowing equipment storage, maintenance and wash bays along with carpenter shops and storage buildings for road maintenance materials and equipment.\u00a0 Several different divisions of local government share the vehicle maintenance and benefit from the large storage resources at the public works facility.<\/p>\n<p><a style=\"color: #ff4b33; line-height: 24px; font-size: 16px;\" href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey1.png\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-594 alignleft\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey1-300x186.png\" alt=\"ramsey1\" width=\"300\" height=\"186\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey1-300x186.png 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey1.png 560w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>There is an additional 53,000 square foot cold storage for roadway salt and sand.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a style=\"color: #ff4b33; line-height: 24px; font-size: 16px;\" href=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-595 alignright\" src=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey2-300x225.jpg\" alt=\"ramsey2\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey2-300x225.jpg 300w, https:\/\/www.palanisami.com\/wp-content\/uploads\/2014\/05\/ramsey2.jpg 434w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>PAI provided structural design engineering including participation in design progress meetings, review of soils reports and coordination with consultant team.\u00a0 PAI staff prepared structural drawings and specifications through the construction development phase.\u00a0 Review of shop drawings, QC reports, construction management and field observations were also provided by PAI.<\/p>\n<p>The main structure is supported on spread footings with steel beam and joist girders with a substantial slab-on-grade floor construction, pre-cast wall panels and metal roof deck<\/p>\n<p>Construction Cost:\u00a0\u00a0\u00a0\u00a0\u00a0 $23 million<\/p>\n<p>Construction Period:\u00a0\u00a0 2004<\/p>\n ","protected":false},"excerpt":{"rendered":"<p>&#8211; Arden Hills, Minnesota &#8211; The new 190,000 square foot Ramsey County\/Partners facility built on the former TCAAP property was designed as a shared resource center with office space, high ceilings for front end loaders, heavy cranes and snow plowing equipment storage, maintenance and wash bays along with carpenter shops and storage buildings for road [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[],"class_list":["post-592","post","type-post","status-publish","format-standard","hentry","category-public-works"],"_links":{"self":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=592"}],"version-history":[{"count":3,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/592\/revisions"}],"predecessor-version":[{"id":739,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=\/wp\/v2\/posts\/592\/revisions\/739"}],"wp:attachment":[{"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palanisami.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}