– St. Paul, MN –

 

joc1 This project involved combining several law enforcement and military related information systems at one emergency operations center.

The old National guard armory had an existing 60’ by 40’, 2,600 square foot classroom that PAI engineers helped remodel to contain communications monitoring systems, radios, large video screens, cameras and security systems with back-up generator power.

 

joc2

PAI provided the electrical & mechanical design services for construction that was staged because the work was done while the Joint Operations Center was active.

PAI engineers prepared structural, mechanical & electrical plans, calculations and specifications for the Joint Operations Center following meetings with the architect to determine the specific JOC facility design requirements. PAI engineers also reviewed shop drawings, performed inspections and construction administration & management during construction.

joc3

 

 

Construction Period: June 2004 – Dec. 2004

Construction Cost: $500,000