– Welch, MN – New 30,000 sf one-story pool and spa addition adjacent to the hotel that was built in 2007. The addition includes a large indoor family pool with two slides, smaller indoor adult pool with a swim-up barefoot bar, 320 ft. lazy river, zero depth family pool with water features and Toucan slide, […]
You are browsing archives for
Category: Precast
Capitol Campus Parking Facilities Lot F
-St. Paul, MN- New 4-level, 526 stall, parking structure located West of the Transportation Building on the Capitol Campus in St. Paul. The parking structure includes two stair towers at opposite corners as well as an elevator tower. The stairs are constructed of precast concrete. The foundation is composed of concrete footings and columns with […]
Black Bear Casino Parking Ramp
-Carlton, MN- This project consisted of structural design consulting and PAI working directly with the precast concrete vendor, Hanson Structural Precast Company to construct the four-story parking ramp that will add over 1,543 parking spaces to the Black Bear Casino guest parking areas. PAI provided the design load calculations, pre-cast member design engineering services […]